I do not have much VM Ware experience but I am looking for the following information. I have a Master Gold VDI that I initially will do a full copy to a classroom. At some point, I want to update the Master Image (Windows Updates, A/V, etc.) and then push the updated image to the classroom over a WAN. My question is this, can I push just the changes or do I have to re-push the entire new, updated Master Image? The training class images will not be modified during use so no issue with wiping out any user changes
↧